Skip to content

Guide

Technical rider: what it contains and how the venue reads it

The rider is the artist’s order to the venue. This guide shows what a technical rider contains, how to tell requirements from wishes, and how to reply before the contract is signed.

Updated · 9 min read

A technical rider is a document in which the artist describes what the production needs to put on the show: sound, lighting, stage, power, backline, crew and times. It is usually attached to the contract as an appendix. The most important parts are the input list and the stage plot. Food, dressing rooms, hotel and transport go in a separate document, a hospitality rider.

For the venue, the rider is a work list. Everything in it must either be provided, hired in or negotiated away before the get-in.

What a technical rider contains

No two riders are the same, but most follow the same structure. These are the parts you should recognise.

Contacts and times

At the top are the name, phone number and email of the tour manager, the production manager and the touring technicians. Then come the times: get-in, soundcheck, doors, show start and get-out. If the times are missing, that is the first thing to ask about.

Input list

The input list is the heart of the technical rider. It has one line per sound source on stage: the instrument, the microphone or DI to be used, the stand and whether the source needs phantom power (48 V). From the list, the sound engineer can quickly see whether the desk has enough channels, and whether the venue has enough microphones, DIs and stands. A duo often manages with eight channels, while a large band with horns can easily pass 40.

Stage plot

The stage plot is a drawing of the stage seen from above. It shows where the musicians stand, where amplifiers, monitors and risers go, and where power is needed. A good plot gives the dimensions of the risers and shows where the audience is, so nobody mixes up left and right.

Backline

Backline is the instruments and amplifiers on stage: drum kit, bass and guitar amps, keyboards, stands and stools. The rider should separate what the artist brings from what the promoter has to provide. In concert halls the grand piano is an item of its own, with the preferred tuning (for example 440 or 442 Hz) and a time for the piano tuner.

PA, FOH and monitors

This is where the requirements for the house sound system (PA) and the mixing desks go. FOH (front of house) is the mix position out in the hall. Many riders require it to be in the middle of the hall, and not under the balcony. The monitor section says how many monitor mixes the artist needs, whether they are floor monitors (wedges) or in-ear, and whether the production brings its own monitor engineer. If they use wireless microphones or in-ear monitors, ask for the frequencies early.

Lighting

Some artists tour with their own lighting designer and their own lighting rig. Others use the venue’s rig and just send a few wishes about mood and colours. If the rider mentions smoke or haze, the fire alarm has to be sorted out: smoke can set off the alarm, and isolating detectors usually requires a fire watch.

Stage, power and crew

The rider gives the minimum stage dimensions (width, depth and clear height), any need for fly bars or rigging points, and power: number of circuits, connector types and voltage. The Norwegian regional theatre Teater Innlandet, for example, lists a playing area of 10 x 9 metres, six fly bars and at least one 63 A circuit as guideline requirements for the arts centres it plays in. Finally, it says how many local crew the production needs for the get-in and get-out.

Check the voltage carefully. Many older Norwegian buildings have a 230 V IT system (IT-nett, an earthing arrangement that is unusual outside Norway). Productions from abroad are used to TN systems with 400 V, which are also more common in newer Norwegian installations. If the rider says 400 V, you need to know what the venue has, and whether a transformer is needed.

Bands, DJs and theatre

A band usually has the longest technical rider, with an input list, backline and several monitor mixes. A DJ needs fewer channels but is particular about the equipment: specific players and mixer, a sturdy table at the right height and good monitors in the DJ booth. Theatre and dance are more about stage dimensions, fly bars, masking and dance floor. Stand-up often manages with one microphone, a stool and good front light.

Technical rider and hospitality rider

A hospitality rider is the artist’s list of what they need off stage: food, dressing rooms, hotel, transport and guest lists. It is often in the same document as the technical rider, but it is read by different people at your venue.

Technical riderHospitality rider
AboutWhat is needed to put on the showWhat is needed for the people to have a good day
Typical contentInput list, stage plot, backline, PA, monitors, lighting, power, stage dimensions, times and crewCatering, dressing rooms, hotel, transport, parking and guest lists
Read byThe technical manager and the techniciansThe producer, the artist liaison and whoever books the hotel

This is what a hospitality rider typically covers:

  • Catering: number of people, times for lunch and dinner, allergies and diets, or a buyout (money instead of dinner).
  • Dressing rooms: number of rooms, locks, mirrors, showers, towels, water and coffee.
  • Hotel: number of rooms, single or double, a list of names and the dates.
  • Transport and parking: pick-up from the airport or station, and space for a bus or truck near the loading entrance.
  • Guest list: number of tickets for the artist’s guests, and who sends the names.

Allergies and medical needs are always requirements, even if they are in the hospitality section. If alcohol is on the list, check it against the venue’s licence to serve alcohol (skjenkebevilling) and its own rules.

Requirement or wish?

The word “rider” means an addition to a contract, and that is exactly what the rider is: an appendix. If you sign the contract without comments, you have in practice said yes to everything in it.

At the same time, not everything is equally important. Many riders are written for the biggest stage on the tour, and the production knows that a smaller venue will not have everything. The wording shows where there is room to negotiate:

  • Requirement: “must”, “shall”, “required” and “no substitutes” (in Norwegian riders: “må” and “skal”). Here you need a written yes from the production before you swap anything.
  • Wish: “preferred”, “if possible” and “or equivalent” (in Norwegian: “ønskes”, “om mulig” and “eller tilsvarende”). Here you can suggest what the venue has.

If in doubt, ask. A short question to the production manager three weeks ahead is better than a discussion at the edge of the stage at four o’clock on the show day.

How the venue reads a technical rider

With a set routine, even a long rider becomes manageable. This is how many venues do it:

  1. Find out who is responsible. If the venue is the promoter, it is you who has to fulfil the rider. If a touring promoter hires the hall, the promoter is responsible to the artist, but you still need to know what is coming through the door.
  2. Check the version. Riders are updated during the tour. Look for a date, and ask the production manager to confirm that you have the latest version.
  3. Check it against your own equipment. Go through the input list, backline, monitors, lighting and power against the venue’s equipment list. Mark each line: we have it, must be hired, or needs clarifying.
  4. Make a hire list. Whatever you do not have must be hired in or negotiated away. Get prices early, and agree who pays.
  5. Ask all your questions at once. Send them in one email to the production manager or the FOH engineer, ideally several weeks before the show. That gives them time to answer, and you time to hire.
  6. Send the venue’s technical specification back. The tech spec shows the artist what they are actually coming to. Many deviations sort themselves out once their engineer sees what you have.
  7. Agree deviations in writing, before the contract is signed. Send an annotated rider or a short list of deviations, and get it confirmed by email. A verbal yes is of little help if there is a disagreement on the show day.
  8. Put what was agreed into the production sheet. The technicians on shift should work from what was agreed, not from the rider as it was before you negotiated. Gather times, crew and agreements in the production sheet.

What the venue’s tech spec should include

A good tech spec saves both sides a lot of emails. Include:

  • contacts for technical and production
  • the address for the get-in, loading dock, door dimensions and the distance to the stage
  • parking for bus and truck, and whether there is shore power for the bus
  • stage dimensions, clear height, fly bars and rigging points with their load capacity
  • power: circuits, connector types and whether the venue has an IT or TN system
  • sound: PA, desks, microphones, DIs and monitors
  • lighting: desk, fixtures and any follow spot
  • backline, grand piano and dressing rooms
  • the venue’s sound level limit and rules for smoke and pyro
  • hall and stage drawings

When the rider gets long

Long riders are where AI helps most. In ProjectX you upload the rider as a PDF or an image, and the AI picks out the requirements point by point, sorted into sound, lighting, stage and hospitality, with requirements kept apart from wishes. The requirements are checked against the venue’s own equipment register, and anything missing is flagged well before the get-in. The producer goes through the list and marks each item: OK, missing or not applicable. Read more about riders and hospitality.

Checklist from rider to get-in

Use the list before you confirm the rider, and once more the week before the show.

  • The latest version of the rider is confirmed by the production.
  • It is clear who fulfils the rider, and who pays for what has to be hired.
  • The input list is checked against desk channels, microphones, DIs and stands.
  • Monitor mixes, wedges, in-ear and wireless frequencies are sorted.
  • Backline is allocated: what the artist brings, what the venue provides and what is hired.
  • The stage plot fits the stage, with risers and power where they should be.
  • The power requirements are checked against circuits, connectors and the type of system.
  • Lighting is agreed, and any smoke is cleared with the person responsible for fire safety.
  • Get-in, soundcheck, doors, start and get-out are confirmed.
  • Local crew are booked in the right numbers.
  • Food, dressing rooms, hotel, transport and parking are booked.
  • All deviations are confirmed in writing and entered in the production sheet.

Technical rider template and example

Many smaller artists have no rider, or one that is several years old. Send them this template. You get the answers you need, and the artist gets a document they can use for the whole tour. The headings can be copied straight into a blank document:

  1. Contacts: name, phone and email for the tour manager, production manager and technicians.
  2. About the production: artist, number of people on tour, length of the show, date and version.
  3. Times: preferred get-in, soundcheck, doors, start and get-out.
  4. Stage: minimum stage dimensions, clear height and risers with dimensions.
  5. Power: number of circuits, connector types, voltage and position on stage.
  6. Input list: one line per channel, see the example below.
  7. Monitors: number of mixes, wedges or in-ear, and who mixes.
  8. Backline: what the artist brings, and what the promoter must provide.
  9. PA and FOH: requirements for the system and desk, and the preferred FOH position.
  10. Lighting: own lighting design or the venue’s rig, own technician, smoke or haze.
  11. Crew: how many local crew are needed, and when.
  12. Stage plot: a drawing seen from above, with the audience marked.
  13. Hospitality: a separate page with food, dressing rooms, hotel, transport and guest list.

Example input list

This is what the input list might look like for a small band with drums, bass, guitar, keyboard and two vocalists:

ChannelSourceMicrophone or DIStand
1Kick drumDynamicShort boom
2SnareDynamicShort boom
3Hi-hatCondenser, 48 VShort boom
4TomDynamicClamp
5Floor tomDynamicClamp
6Overhead leftCondenser, 48 VTall boom
7Overhead rightCondenser, 48 VTall boom
8BassDINone
9GuitarDynamicShort boom
10Keyboard leftDINone
11Keyboard rightDINone
12Vocal 1Dynamic vocal micTall boom
13Vocal 2Dynamic vocal micTall boom

The monitor requirements are often set out in a separate list: who needs which mix, and whether it is a wedge or in-ear.

Sources

The first source is in English, the other two are in Norwegian.

Want to see how it works in practice?

A demo takes 30 minutes, with your own venue in mind.

Book a demo